CLOUD INFRASTRUCTURE // AWS · AZURE · GCP
Allari assumes operational custody of your cloud infrastructure — monitoring, patching, scaling, incident response, cost optimization — so your engineers focus on the workloads that move the business. Full-stack coverage across AWS, Azure, and GCP with open-book transparency.
Or quantify your execution drag →Full-stack custody. Open-book pricing. No lock-in.
Most ERP providers stop at the application layer. They'll optimize your JDE batch jobs but ignore the EC2 instances running them.
This creates a structural void. When performance degrades, is it the application or the infrastructure? The result: finger-pointing between your ERP vendor and cloud team while your business waits.
Allari's Full-Stack Custody model eliminates this gap. Our Principal Cloud Engineers and DevOps Leads manage both layers—from your SAP HANA database to the Azure VM hosting it.
THE STRUCTURAL VOID — ELIMINATED
ERP APPLICATION LAYER
✓ NO MORE FINGER-POINTING
ALLARI INFRASTRUCTURE FOUNDATION
One team. One framework. Complete visibility.
TYPICAL FINOPS SAVINGS
20-30%
Allari uses the Power of 15™ to right-size environments in real-time, converting "Cloud Waste" into "Roadmap Funding."
RIGHT-SIZING
Continuous instance optimization
RESERVED INSTANCE STRATEGY
Commit where it counts
WASTE ELIMINATION
Zombie resources identified & terminated
Why high-cost architects are spending 50% of their week on infrastructure 'noise' — and how forensic custody eliminates the structural drag across hybrid cloud stacks.
Continuous cost monitoring, right-sizing, reserved instance optimization. Power of 15™ converts Cloud Waste into Roadmap Funding.
Terraform, CloudFormation, ARM templates for repeatable, auditable deployments. Prevents 'Snowflake' configurations.
Cloud security posture management, IAM governance, encryption, and audit readiness across all hyperscalers.
Multi-AZ/region architectures, disaster recovery, and business continuity planning managed by Principal Cloud Engineers.
Law #3 of the Physics of IT: Left unattended, systems diverge from their baseline state. In cloud environments, this means "Snowflake" configurations—servers that are unique, undocumented, and impossible to recreate.
The impact: When a snowflake fails, your Principal Cloud Engineers spend hours reverse-engineering configurations instead of restoring service. Repeat incidents compound. Drift becomes Infrastructure Drag.
The solution: Infrastructure as Code (IaC) enforces the baseline. Every configuration is versioned, auditable, and repeatable. Our DevOps Leads deploy via Terraform, CloudFormation, and ARM templates—eliminating snowflakes by design.
DRIFT PREVENTION RESULTS
73%
REDUCTION IN REPEAT INCIDENTS
UNIFIED OPERATIONS: ERP + INFRASTRUCTURE
A regional healthcare provider unified their ERP and infrastructure operations under Allari's Full-Stack Custody model. By eliminating the coverage gap between application and infrastructure teams, they achieved zero unplanned downtime and 45% reduction in cloud costs through systematic FinOps governance.
VIEW FULL CASE STUDY0
UNPLANNED DOWNTIME
45%
COST REDUCTION
KEY INSIGHT: Unified Operations (ERP + Infrastructure) eliminated escalation delays and vendor finger-pointing.
Cloud Infrastructure custody integrates with our ERP platform expertise. One team, one framework, complete coverage.
SECTOR EVIDENCE LEDGER
Consolidated sector evidence. Each entry preserves industry-specific execution data and maps to the platform's stabilization protocol. Reference: Site HT-2025 | MRV 1.77d | Capacity Recovery 40%.
| Sector | Case File | Status | Key Capabilities |
|---|---|---|---|
| Manufacturing | CI-MFG-01 | VALIDATED | High-availability ERP hostingDisaster recoveryEdge compute |
| Financial Services | CI-FIN-01 | ACTIVE | SOC 2 complianceData sovereigntyEncryption at rest |
| Healthcare | CI-HCR-01 | ACTIVE | HIPAA-compliant hostingPHI data isolationAudit logging |
| Distribution & Logistics | CI-DST-01 | MONITORING | Multi-region deploymentCDN optimizationReal-time data sync |
[CLINICAL_METHODOLOGY]
The 16-day baseline reflects the documented state of client environments prior to Allari custody. Post-stabilization velocity ( 1.77 days MRV ) represents the Allari Stability Standard over a 27-month longitudinal study, verified by IT Process Institute.